
Understanding Energy Management Agreements (EMAs) for Your Energy Trading Strategy
There are two primary ways energy asset owners can manage their generator and energy storage resources — they can contract with a third-party provider through
There are two primary ways energy asset owners can manage their generator and energy storage resources — they can contract with a third-party provider through
A battery energy storage system (BESS) is an integrated system that uses rechargeable batteries to store electrical energy for later use. With the increased integration
NEW: NERC has extended the Q1-Q3 GADS reporting deadlines to 12/19/2024! Since 2024, NERC compliance reporting deadlines for GADS Q1–Q3 have been extended to December
The Midcontinent Independent System Operator’s (MISO)?annual transmission planning activities, known as the MISO Transmission Expansion Plans (MTEP), are designed to optimize the grid’s performance by
The Independent Electricity System Operator (IESO) is responsible for operating Ontario’s electricity market, managing the province’s power grid and ensuring Real-Time operations run smoothly. With
As President and COO of PCI, I had the privilege of representing our team at this year’s Energy Trading Week Americas. Participating in a panel
The proposed California Independent System Operator (CAISO) Extended Day-Ahead Market (EDAM) represents a significant shift in regional energy trading and transmission management. Designed to foster
Operated by the Southwest Power Pool (SPP), the SPP Integrated Marketplace (SPPIM) is designed to ensure a reliable power supply, adequate transmission infrastructure, and competitive
The Southwest Power Pool (SPP) Regional Transmission Organization (RTO) is driving a major RTO expansion with its expanded footprint into the Western Interconnection, opening up
As energy markets evolve and demand for electricity increases, the ability to transfer power reliably across regions is more critical than ever. Available Transfer Capability
In energy transmission, maintaining a reliable and efficient grid depends on knowing how much power can be transferred across the system safely. This is where
In the world of energy transmission, ensuring the reliability and safety of the grid is a top priority for operators and regulatory bodies alike. This
In utility risk management, a wide array of operational, financial, market, regulatory, and compliance issues can potentially disrupt energy production and distribution. To ensure operational
Energy arbitrage plays a crucial role in energy markets, particularly in balancing supply and demand and supporting grid stability. For utilities, using battery storage to
The California Independent System Operator (CAISO) will launch the Extended Day-Ahead Market (EDAM) in May of 2026. This is a significant enhancement to its existing
Subscribe to our newsletter
© Power Costs, Inc. 2025 | All Rights Reserved.
[gravityform id=”3″ title=”false” description=”false” ajax=”true”]
[gravityform id=”4″ title=”false” description=”false” ajax=”true”]