Skip to content
  • Solutions
  • Markets
  • Resources
  • About
Set Up A Call
Back

Solutions

The PCI Platform

New

A secure, reliable, high-performance, cloud-native foundation that powers our full-spectrum suite of solutions and natively integrates AI-enabled enterprise analytics

View the platform

AI

New

Insights

Hot

Security

Hot

Technology

Hot

Solutions

Energy Trading

ETRM

PCI ETRM

End-to-end energy trading, risk, and scheduling in one system

  • ETRM
  • Front Office: Gas & Fuels
  • Front Office: Power
  • Middle Office
  • Back Office
  • ETRM
  • Front Office: Gas & Fuels
  • Front Office: Power
  • Middle Office
  • Back Office

Power Markets

GenManager®

Optimize power market bidding, risk, and scheduling

  • Power Markets
  • Market Participation
  • Settlements and Billing
  • Meter Data Management
  • Power Markets
  • Market Participation
  • Settlements and Billing
  • Meter Data Management

Portfolio Optimization

GenTrader®

Maximize portfolio value with integrated optimization

  • Portfolio Optimization
  • Energy Trading Optimization
  • Energy Storage Optimization
  • Forecaster
  • Long-Term Planning
  • Sustainable Energy
  • Portfolio Optimization
  • Energy Trading Optimization
  • Energy Storage Optimization
  • Forecaster
  • Long-Term Planning
  • Sustainable Energy

Transmission & Reliability

Transmission

New
Manage transmission rights, congestion, and settlements
  • Transmission
  • Transmission Scheduling
  • e-Tagging
  • Transmission Portfolio Opt.
  • BA Operations
  • Energy Accounting
  • Transmission
  • Transmission Scheduling
  • e-Tagging
  • Transmission Portfolio Opt.
  • BA Operations
  • Energy Accounting

Outage Management

New

Plan and coordinate outages with built-in compliance

  • Outage Management
  • Operator Logging
  • Gen. Outage Management
  • Trans. Outage Management
  • Line Rating Management
  • Outage Management
  • Operator Logging
  • Gen. Outage Management
  • Trans. Outage Management
  • Line Rating Management
Back

Markets

PCI Clients Map

Markets We Serve

A Global Footprint

PCI Energy Solutions serves utility companies, independent power producers, and wholesale power traders. We support customers in every organized market in North America and maintain a global presence across five continents.

Markets

Markets

North America

50%+ of North American power is optimized using the PCI Platform

Latinoamerica

PCI da soporte al 90% de la capacidad de generación eléctrica en México

Europe

HOT

PCI has a foothold in Europe with a growing presence

Australia

HOT

Modern outage management  tailored to Australia’s NEM and WEM utilities

Market Chatbots

ISO Bot

Popular

Ask energy market questions of an AI trained on ISO/RTO manuals

M+ Bot

New

AI assistant dedicated to up-to-date SPP Markets+ documentation

CEN Bot

New

Chatbot de IA sobre el mercado eléctrico CENACE

Back

Resources

INFOCUS Customer Conference

Discover why hundreds attend each year

April 14-16 2026

Learn More

Resources

Thought Leadership

Blog

New

Our industry thought leadership

  • ETRM
  • Wholesale Market Participation
  • Gas & Fuels Management
  • Portfolio Optimization
  • Settlements and Billing
  • Generation Outage Management
  • ETRM
  • Wholesale Market Participation
  • Gas & Fuels Management
  • Portfolio Optimization
  • Settlements and Billing
  • Generation Outage Management

Newsletter

Subscribe

Updates on product launches &more 

  • ETRM
  • Wholesale Market Participation
  • Gas & Fuels Management
  • Portfolio Optimization
  • Settlements and Billing
  • Generation Outage Management
  • ETRM
  • Wholesale Market Participation
  • Gas & Fuels Management
  • Portfolio Optimization
  • Settlements and Billing
  • Generation Outage Management

Webinars & Events

HOT

Live & on-demand discussions 

  • ETRM
  • Wholesale Market Participation
  • Gas & Fuels Management
  • Portfolio Optimization
  • Settlements and Billing
  • Generation Outage Management
  • ETRM
  • Wholesale Market Participation
  • Gas & Fuels Management
  • Portfolio Optimization
  • Settlements and Billing
  • Generation Outage Management

Case Studies

HOT

Real-world customer results

 

  • ETRM
  • Wholesale Market Participation
  • Gas & Fuels Management
  • Portfolio Optimization
  • Settlements and Billing
  • Generation Outage Management
  • ETRM
  • Wholesale Market Participation
  • Gas & Fuels Management
  • Portfolio Optimization
  • Settlements and Billing
  • Generation Outage Management

Customer Portal

INFOCUS Conference

Apr

Connect, learn, and shape our future

  • ETRM
  • Wholesale Market Participation
  • Gas & Fuels Management
  • Portfolio Optimization
  • Settlements and Billing
  • Generation Outage Management
  • ETRM
  • Wholesale Market Participation
  • Gas & Fuels Management
  • Portfolio Optimization
  • Settlements and Billing
  • Generation Outage Management

Product Trainings

New

Hands-on remote training

  • ETRM
  • Wholesale Market Participation
  • Gas & Fuels Management
  • Portfolio Optimization
  • Settlements and Billing
  • Generation Outage Management
  • ETRM
  • Wholesale Market Participation
  • Gas & Fuels Management
  • Portfolio Optimization
  • Settlements and Billing
  • Generation Outage Management

Issue Tracker

New

Track, manage, and resolve issues 

  • ETRM
  • Wholesale Market Participation
  • Gas & Fuels Management
  • Portfolio Optimization
  • Settlements and Billing
  • Generation Outage Management
  • ETRM
  • Wholesale Market Participation
  • Gas & Fuels Management
  • Portfolio Optimization
  • Settlements and Billing
  • Generation Outage Management

Product Documentation

New

Guides, references, and release notes

 

  • ETRM
  • Wholesale Market Participation
  • Gas & Fuels Management
  • Portfolio Optimization
  • Settlements and Billing
  • Generation Outage Management
  • ETRM
  • Wholesale Market Participation
  • Gas & Fuels Management
  • Portfolio Optimization
  • Settlements and Billing
  • Generation Outage Management
Back

About

A trusted partner since 1992

Our Values

Customer Success

Central

We succeed by creating happy customers

Continuous Improvement

New

We continually grow, adapt, and get better

Enlightened Awareness

New

Our character is revealed through our actions

Connectedness

New

Our genuine connections drive shared success

About Us

About

People

Careers

Hiring

Build the future of energy software

  • ETRM
  • Wholesale Market Participation
  • Gas & Fuels Management
  • Portfolio Optimization
  • Settlements and Billing
  • Generation Outage Management
  • ETRM
  • Wholesale Market Participation
  • Gas & Fuels Management
  • Portfolio Optimization
  • Settlements and Billing
  • Generation Outage Management

Leadership

HOT

Meet the leaders driving our vision

 

  • ETRM
  • Wholesale Market Participation
  • Gas & Fuels Management
  • Portfolio Optimization
  • Settlements and Billing
  • Generation Outage Management
  • ETRM
  • Wholesale Market Participation
  • Gas & Fuels Management
  • Portfolio Optimization
  • Settlements and Billing
  • Generation Outage Management

Connect

Contact Us

New

Talk with our experts today

  • ETRM
  • Wholesale Market Participation
  • Gas & Fuels Management
  • Portfolio Optimization
  • Settlements and Billing
  • Generation Outage Management
  • ETRM
  • Wholesale Market Participation
  • Gas & Fuels Management
  • Portfolio Optimization
  • Settlements and Billing
  • Generation Outage Management

Newsroom

New

Company news & announcements

  • ETRM
  • Wholesale Market Participation
  • Gas & Fuels Management
  • Portfolio Optimization
  • Settlements and Billing
  • Generation Outage Management
  • ETRM
  • Wholesale Market Participation
  • Gas & Fuels Management
  • Portfolio Optimization
  • Settlements and Billing
  • Generation Outage Management
  • Blog
  • PJM’s Capacity Market and FERC Order 841
Share this post
Picture of Patrick McGarry

Patrick McGarry

battery

PJM’s Capacity Market and FERC Order 841

August 23, 2021
/
US ISO/RTO Markets

A Three-Part Blog Series

Part 3: The Long & Winding Road – PJM FERC Order 841 Compliance Achieved

 

In the first two posts of our 3-part series, PCI covered SPP & CAISO’s compliance with FERC Order 841 to integrate Energy Storage Resources into their markets. Our third and final blog outlines the history of PJM to include energy storage in the capacity market and why the ELCC proposal received a green light from FERC. In addition, we cover the basic concepts of Effective Load Carrying Capability and how PJM answered challenging capacity market questions.

 

PJM in the Capacity Market

Principles like resource neutrality, fuel agnosticism, and non-discriminatory economic merit are built into the RTO DNA of all organized markets.

The design and implementation of extensive market structures to manage day-to-day system operations and, in some situations, longer-term resource adequacy is central to the RTO model and what distinguishes it from other types of system operators.

The price is the driving force behind these structures.

PJM is an RTO long noted for rancor regarding capacity market structure debates. Learn more in our blog post, “What Is a Capacity Market?”

No veteran market watcher was surprised when energy storage resource implementation became entangled in the capacity market debate.

But on July 30, 2021, PJM finally became fully compliant with FERC Order 841 as energy storage of different durations can now participate in PJM’s capacity market.

 

History

On October 17, 2019, FERC accepted, subject to a further compliance filing, PJM’s proposed tariff revisions to its Tariff and Amended and Restated Operating Agreement in compliance with the requirements of FERC Order 841.

FERC requested two items from PJM:

1-To submit tariff revisions reflecting the minimum run-time rules and procedures for every resource.

2- To investigate whether PJM’s minimum run-time rules and procedures were unjust, unreasonable, unduly discriminatory, or preferential as applied to Capacity Storage Resources.

FERC expressed the following concerns:

  • PJM applied a 10-hour minimum run-time requirement to Capacity Storage Resources while applying a 4-hour minimum run-time requirement to intermittent resources
  • The 10-hour minimum run time did not reflect the physical and operational characteristics of Capacity Storage Resources.
  • Multiple PJM tariff provisions differed in the treatment of Capacity Storage Resources and Generation Capacity.
 

PJM ELCC (Effective Load Carrying Capability) Proposal

Before we discuss PJM’s accepted proposal, we need to cover a few key definitions:

Effective load-carrying capability (ELCC) is a metric to assess capacity credit for wind plants and any power plant. ELCC can be defined as a measure of additional load that the system can supply with a particular interest generator, with no net change in reliability.

ELCC provides a way to assess the capacity value (or reliability contribution) of a resource (or a set of resources) that is tied to the loss of load probability concept (LOLE).

Capacity adequacy of the PJM system is assessed using Loss of Load Expectation (LOLE). The LOLE is the expected number of hours per year in which, over the long term, it is statistically expected that supply will not meet demand. A standard industry target for the loss of load is not to exceed more than one day in ten years.

LOLE is a probabilistic approach where the actual amount will vary depending on the circumstances in a particular year. LOLE values are generally deduced from a much longer-term average.

PJM uses LOLE to set up the requirement in the capacity market

The Reserve Requirement Study (RRS) is the primary resource adequacy study in PJM.

 

PJM ELCC PROPOSAL

PJM proposed to classify three types of resources as ELCC Resources:

  1. Variable Resources: Generation Capacity Resource with output that can vary according to energy sources, such as wind, solar, run-off river hydroelectric power without storage, and landfill gas units without an alternate fuel source.
  2. Limited Duration Resources: Generation Capacity Resource such as an Energy Storage Resource that cannot run continuously at Maximum Facility Output for 24 hours or longer and that is neither a Variable Resource nor a Combination Resource.
  3. Combination Resources: Generation Capacity Resource has a component with the characteristics of a Limited Duration Resource combined with either a component that has the characteristics of an Unlimited Resource or a component that has the characteristic of a Variable Resource.

PJM’s ELCC analysis uses probabilistic modeling to evaluate the contribution of a resource to meeting PJM’s LOLE standard of one day in ten years and distinguished among resources with differing levels of reliability, size, and hourly output profiles to determine an ELCC rating for a given resource or a class of resources (an ELCC rating)

A resource that contributes significantly during high-risk hours will have a higher capacity value (ELCC) than a resource that delivers the same capacity only during low-risk hours.

 
Effective Load-Carrying Capacity

Critical Points to Measure the Capacity Value of a Resource
 
Loss of Load Expectation Graph
Loss of Load Expectation Graph (Source: PJM)
 
  • One intuitive way to measure the benefit would be to run a new RRS using the original portfolio P plus the new resource X
  • Without any changes to the load, the reliability of the PJM system would be better than 0.1 events/year because there is an additional resource (X) in the system
  • If the peak load is then increased by an amount of L, the reliability of the PJM system will be back at 0.1 events/year.
  • The additional peak load (L) that PJM can now serve to preserve the reliability of 0.1 events/year is the capacity value or reliability contribution of the new resource X

In the PJM proposal, they contended the following points:

  • The ELCC methodology considers the simultaneous reliability contribution of all resources and recognizes the complementary and antagonistic interactions among resources expected to be able to provide capacity in a given Delivery Year
  • The ELCC construct:
    • recognizes the diminishing returns associated with greater levels of deployment for most ELCC Resource types to ensure the region does not become overdependent on a single resource type with inherent limitations
    • recognizes the synergistic relationship among distinct resource types, potentially facilitating the greater provision of reliability from various resource classes pooled together across the PJM region than whose same classes could provide in isolation
    • evolves with a changing load shape to account for changes in the future grid, such as greater electrification of heating and transportation.
  • ELCC provides a way to assess the capacity value (or reliability contribution) of a resource (or a set of resources) tied to the loss of load probability.
 

FERC

FERC accepted PJM’s updated ELCC proposal because “it establishes a just, reasonable, and not unduly discriminatory or preferential framework for determining the capacity value of Variable Resources, Limited Duration Resources, and Combination Resources.”

FERC found that PJM assigns a capacity value to the portfolio of ELCC Resources consistent with their collective contribution to meeting PJM’s LOLE standard.

 

The rationale behind the original RTO paradigm is significant because RTO/ISO markets have struggled to adopt new technologies like batteries. Public policy, technology, and RTO market rules have combined to create tension that will challenge the integration of energy storage resources.

In PJM, all things seem to pass through the eye of the resource capacity hurricane. To their credit, PJM decided to tackle an extremely controversial target, defining capacity value, while revising the tariff to implement an expected massive wave of energy storage resources. The class average ELCC approach reasonably assigns capacity value to resources with the same performance within a class, recognizing that all resources in a class contribute to changes to the overall ELCC of the class.

While FERC’s approval of PJM’s ELCC approach represents a “final” stage of regulatory approval, tariff revisions on energy storage resources will likely evolve over the next few years as technology continues to advance.

 PCI’s goal is to provide clients with (a) consultation and guidance as PJM implement the ELCC methodology and future revisions and (b) to ensure a robust implementation of any deployed changes to the PCI platform.

 

FERC Order 841 & Energy Storage Integration in Wholesale Power Markets: A Three-Part Blog Series

  • SPP Market Storage Resources and FERC Order 841
  • CAISO Energy Storage and FERC Order 841
  • PJM’s Capacity Market and FERC Order 841 < You are here

 

Sources

  • Comparing Resource Adequacy Metrics, NREL-National Renewable Energy Laboratory, November 11-13, 2014
  • Effective Load Carrying Capability (ELCC)-PJM, April 7, 2020
  • FERC Order 841: Electric Storage Participation in Markets, PJM, June 6 & 11, 2019
  • FERC Order Accepting Tariff Revisions and Terminating Section 206 Proceeding- FERC Docket Nos. ER21-2043-000: ER20-584-000: EL19-100-000
Picture of Patrick McGarry

Patrick McGarry

Patrick McGarry joined PCI from 2019-2023. He owns more than 35 years of experience in the commodities trading markets, with the last 25 specifically in the energy industry. At PCI, Patrick lead a team focused on ensuring clients are set for success when leveraging PCI software for their business operations.

Related blog posts

Loading...
tuscon arizona sky
Feb 17
SPP,SPP Markets Plus,US ISO/RTO Markets

Tucson Electric Power Selects PCI Energy Solutions for Its Transition into SPP Markets+ Ahead of 2027 Launch

transmission lines
Jan 22
US ISO/RTO Markets,Wholesale Market Participation

SPP Markets+ Launches Its Implementation Strike Team — What Participants Need to Know

transmission lines at sunset
Dec 15
US ISO/RTO Markets,Wholesale Market Participation

Why WRAP’s Next Chapter Matters for the Future of Western Markets — & Markets+

Related press

Loading...
tuscon arizona sky
Feb 17
SPP,SPP Markets Plus,US ISO/RTO Markets

Tucson Electric Power Selects PCI Energy Solutions for Its Transition into SPP Markets+ Ahead of 2027 Launch

Dec 09
About Us,Our Technology

PCI Energy Solutions Named a 2025 Geo & Global AWS Partner Award Finalist

Dec 09
About Us,Cybersecurity

PCI Achieves SOC 2 Type II Attestation, Reinforcing Security for 2026 & Beyond

PCI Energy Solutions

PCI Energy Solutions

Also known as Power Costs, Inc.

Connect with us

U.S. 1+ 405.447.6933

Sales 1+ 405.701.7301

301 David L. Boren Blvd., Suite 2000
Norman, OK 73072

Contact us

We’re Hiring! 

Linkedin Twitter
  • Platform
  • PCI AI
  • PCI Insights
  • Our Technology
  • Cybersecurity
  • AWS Partnership
  • Solutions
  • ETRM
  • Power Markets
  • Portfolio Optimization
  • Transmission
  • Outage Management
  • Customer Portal
  • INFOCUS Conference
  • Product Trainings
  • Product Documentation
  • Issue Tracker
  • About
  • Careers
  • About Us
  • Leadership
  • Newsroom

Subscribe to our newsletter

Subscribe

© Power Costs, Inc. 2026 | All Rights Reserved.

  • Privacy Policy
  • Sitemap
Manage Cookie Consent
To provide the best experiences, we use technologies like cookies to store and/or access device information. Consenting to these technologies will allow us to process data such as browsing behavior or unique IDs on this site. Not consenting or withdrawing consent, may adversely affect certain features and functions.
Functional Always active
The technical storage or access is strictly necessary for the legitimate purpose of enabling the use of a specific service explicitly requested by the subscriber or user, or for the sole purpose of carrying out the transmission of a communication over an electronic communications network.
Preferences
The technical storage or access is necessary for the legitimate purpose of storing preferences that are not requested by the subscriber or user.
Statistics
The technical storage or access that is used exclusively for statistical purposes. The technical storage or access that is used exclusively for anonymous statistical purposes. Without a subpoena, voluntary compliance on the part of your Internet Service Provider, or additional records from a third party, information stored or retrieved for this purpose alone cannot usually be used to identify you.
Marketing
The technical storage or access is required to create user profiles to send advertising, or to track the user on a website or across several websites for similar marketing purposes.
  • Manage options
  • Manage services
  • Manage {vendor_count} vendors
  • Read more about these purposes
View preferences
  • {title}
  • {title}
  • {title}

Request More Information

  • This field is for validation purposes and should be left unchanged.

Name
I am not a robot 🤖

Solutions

Energy Trading and Optimization

  • ETRM
  • Wholesale Market Participation
  • Gas & Fuels Management
  • Portfolio Optimization
  • Settlements and Billing
  • Generation Outage Management
  • ETRM
  • Wholesale Market Participation
  • Gas & Fuels Management
  • Portfolio Optimization
  • Settlements and Billing
  • Generation Outage Management

Transmission and Reliability

  • Transmission Outage Management
  • Transmission Scheduling
  • e-Tagging
  • Balancing Authority Operations
  • Energy Accounting and Meter Data Management
  • Transmission Outage Management
  • Transmission Scheduling
  • e-Tagging
  • Balancing Authority Operations
  • Energy Accounting and Meter Data Management

Sustainable Energy

  • Energy Trading Optimization
  • Energy Storage Optimization & Trading
  • Hydrogen
  • Hydropower
  • Carbon Intensity
  • Forecasting
  • Energy Trading Optimization
  • Energy Storage Optimization & Trading
  • Hydrogen
  • Hydropower
  • Carbon Intensity
  • Forecasting

Platform

  • PCI AI
  • PCI Insights
  • Our Technology
  • Cybersecurity
  • AWS Partnership
  • PCI AI
  • PCI Insights
  • Our Technology
  • Cybersecurity
  • AWS Partnership

Markets

  • North America
  • Latinoamerica
  • Europe
  • Australia
  • North America
  • Latinoamerica
  • Europe
  • Australia

Energy Market AI Chatbots

  • ISO Bot (North American Markets)
  • M+ Bot (New Market)
  • CEN Bot (Mexico)
  • ISO Bot (North American Markets)
  • M+ Bot (New Market)
  • CEN Bot (Mexico)

Resources

Thought Leadership

  • Blog
  • Newsletter
  • Webinars & Events
  • Case Studies
  • Blog
  • Newsletter
  • Webinars & Events
  • Case Studies

Customer Portal

  • INFOCUS User Conference
  • Product Trainings
  • Product Documentation
  • Issue Tracker
  • INFOCUS User Conference
  • Product Trainings
  • Product Documentation
  • Issue Tracker

About Us

  • About
  • Leadership
  • Newsroom
  • Contact Us
  • About
  • Leadership
  • Newsroom
  • Contact Us

Careers