Case Studies
Case Study Library
Explore real-world examples of how our solutions have helped clients overcome challenges and achieve their goals. Each case study highlights a unique problem and the tangible benefits our clients have experienced.
Automation & Efficiency Improvement
Case Study: Monetizing Meter Data with PCI Energy Accounting
- Client Problem: Validating and optimizing meter data to improve settlements and reduce errors
- Summary: Discover how PCI Energy Accounting helped a client reduce manual meter validation and improve data accuracy, leading to significant cost savings
- Key Benefits:
- Decreased overall manual validation by 75%
- Identified and eliminated bad meter data
- Saved $1 million annually by reducing unnecessary field technician dispatches
- What our client said: “PCI EA has helped us reduce manual validations and improve the accuracy of our meter data, saving us both time and money.” – Senior analyst
Case Study: Streamlining IESO Asset Tracking for a Global Sustainable Infrastructure Provider
- Client Problem: Inefficient and time-consuming manual reporting processes
- Summary: Learn how PCI’s GenManager automated reporting and optimized performance for a leading sustainable infrastructure provider
- Key Benefits:
- Reduced manual reporting time by 60%
- Improved accuracy of performance reports
- Enhanced operational efficiency and insights
- What our client said: “Since implementing GenManager, we’ve achieved massive time savings and improved accuracy by automating these calculations.” — Business analyst
Back Office & Energy Accounting System Upgrade
Case Study: Readying the Back Office to Participate in the Western Energy Imbalance Market (WEIM)
- Client Problem: Replacing legacy back office/energy accounting systems to support WEIM participation
- Summary: Learn how PCI helped a client replace their legacy back office systems to support participation in the Western EIM, improving data accuracy and operational efficiency
- Key Benefits:
- Seamless integration with market settlements and transmission billing
- Enhanced data tracking and auditing capabilities
- Improved efficiency in handling large volumes of data
- What our client said: “We gained immediate benefits using the GenTrader optimization tool after barely entering EIM. We wish we’d had it long before we joined the market.” – Client GM & EIM program manager
ETRM Solutions
Case Study: Optimizing Back-Office Workflows & Revenues Using PCI’s ETRM Platform
- Client Problem: Replacing a legacy ETRM system to consolidate enterprise-wide processes and improve back-office functions
- Summary: Discover how PCI’s ETRM platform helped a client optimize their back-office workflows and increase revenues by streamlining meter data validation and settlement processes
- Key Benefits:
- Reduced time and effort required for meter data validation and settlement
- Enhanced accuracy of settlement calculations and reporting
- Significant cost savings and improved operational efficiency
- What our client said: “In the first six months of using PCI’s ETRM tool, we saw initial savings of over $160,000 — just due to efficiency gains. The savings have only increased since we added system enhancements.” — Settlements analyst
Market Integration & Renewable Resource Management
Case Study: Deploying PCI’s Platform to Capture Benefits in the Western Energy Imbalance Market (WEIM)
- Client Problem: Support multiple market functions and integrate renewable resources
- Summary: Learn how PCI’s platform helped a client participate in the Western EIM, enhancing market functions and integrating renewable resources
- Key Benefits:
- Supported multiple market functions with a single platform
- Enhanced integration of wind and solar resources
- Achieved substantial efficiency gains and lower operating costs
- What our client said: “EIM and PCI are synonymous. We feel both of those three-letter acronyms can be used interchangeably.” — GM & EIM program manager
Case Study: PCI Guides New Participant Into the Western EIM
- Client Problem: Transitioning to the Western EIM and replacing unscalable homegrown systems
- Summary: Discover how PCI guided a client through the transition to the Western EIM, replacing unscalable systems and improving overall market participation
- Key Benefits:
- Seamless transition to the Western EIM
- Replaced unscalable homegrown systems with a robust platform
- Enhanced operational efficiency and market participation
- What our client said: “We gained immediate benefits using the GenTrader optimization tool after barely entering EIM. We wish we’d had it long before we joined the market.” – Client GM & EIM program manager
Market Paricipation & Bidding Optimization
Case Study: Powering Growth: Enabling JOU Modeling and Bidding with PCI’s Software
- Client Problem: Modeling a Joint-Owned Utility (JOU) resource in the CAISO market
- Learn how PCI’s software enabled a client to model and bid a JOU resource in the CAISO market, improving operational efficiency and accuracy
- Key Benefits:
- Enabled accurate modeling and bidding for JOU resources
- Improved integration with existing systems
- Enhanced operational efficiency and accuracy in the CAISO market
- What our client said: “PCI’s software has given us the ability to quickly adapt to changing market conditions and make more informed decisions. It has become an indispensable tool for our team.” — Senior project manager, Wholesale Power Marketing
Case Study: Using PCI’s Integrated Platform to Optimize Northeast Markets Participation
- Client Problem: Optimizing participation in multiple markets and handling bid-to-bill workflows
- Summary: Discover how PCI’s integrated platform helped a client optimize participation in the PJM, NYISO, and ISO-NE markets, improving operational efficiency and data accuracy
- Key benefits:
- Streamlined bid-to-bill workflows across multiple markets
- Improved data accuracy and compliance
- Enhanced operational efficiency and market participation
- What our client said: “PCI has really helped us to diversify our portfolio and uncover many more opportunities across a broader spectrum of market products.” — Manager, Power Settlements
Outage Management System Replacement
Case Study: Successful Deployment of PCI’s Generation Outage Management System at a Major Utility
- Client Problem: Validating and optimizing meter data to improve settlements and reduce errors
- Summary: Discover how PCI’s solution enabled a major utility to replace its legacy outage management system with a modern, consolidated platform, improving flexibility and reducing market risks
- Key Benefits:
- Improved flexibility and ease of use
- Reduced market risks with detailed auditability and edit logging
- Seamless integration with existing systems
- What our client said: PCI’s platform provided us with the flexibility and security we needed to replace our outdated system, significantly reducing our operational risks.” — Project manager
Case Study: Benefits Realized by Deploying PCI’s Solution for Generation & Transmission Outage Management in the Western U.S.
- Client Problem: Consolidating outage management systems and improving outage planning and communication
- Summary: Learn how PCI’s Outage Management solution helped a Western U.S. utility improve outage planning and communication, leading to significant operational efficiencies
- Key Benefits:
- Consolidated multiple databases into a single system of record
- Enhanced outage planning coordination and communication
- Achieved significant cost savings and improved data accuracy
- What our client said: “PCI’s Outage Management solution has dramatically improved our outage planning and communication process. Our team’s collaboration has never been better.” — Director, Thermal Fleet Operations
System Consolidation & Optimization
Case Study: Expanding PCI's Platform to Seize Opportunities in MISO
- Client Problem: Inefficiencies caused by using multiple separate systems from different vendors
- Summary: Discover how we helped a major utility in the Upper Midwest streamline its IT landscape and optimize market opportunities in the MISO region
- Key benefits:
- Consolidated multiple systems into a single platform
- Increased operational efficiency by 35%
- Achieved significant cost savings and improved market participation
- What our client said: “PCI is the most involved and experienced systems vendor in MISO. They’re excellent at making sure we’re fully prepared and ready for any changes to the market.” — IT delivery lead
Case Study: Full Migration to PCI's Enterprise Platform for Maximizing Profits in MISO
- Client Problem: Consolidating multiple solutions and improving bid-to-bill workflows
- Summary: Learn how a full migration to PCI’s Enterprise Platform enabled an Upper Midwest utility to streamline bid-to-bill workflows and maximize profits in the MISO market
- Key Benefits:
- Improved bid-to-bill workflow efficiency
- Enhanced profit and loss analysis capabilities
- Reduced time and costs associated with system upgrades and maintenance
- What our client said: “Buying software’s like buying a car. Anybody can just sell it. But, how it works and is serviced and supported down the road is the key. We found that PCI delivered what they promised, and in many cases, exceeded what was promised.” — IT delivery lead
Case Study: Enhancing Efficiency and Reliability Through Cloud Transition
- Client Problem: Transitioning from legacy in-house systems to a hosted cloud solution while integrating multiple data sources
- Summary: Learn how PCI’s cloud-based platform helped a major utility transition from in-house systems to a hosted solution, integrating multiple data sources and improving operational efficiency and system reliability
- Key Benefits:
- Seamless cloud transition, improving system reliability and user satisfaction
- Enhanced data management, enabling faster business decision-making
- Cost savings by outsourcing infrastructure management, allowing internal staff to focus on strategic tasks
- What our client said: “The transition to PCI’s hosted solution has not only enhanced our operational efficiency but also significantly improved our system reliability and user satisfaction.” — Business System Applications Manager
Portfolio Optimization & Cost Savings
Case Study: Complex Portfolio Optimization Has Saved $500 Million (And Counting)
- Client Problem: Solving complex energy dispatch challenges and optimizing asset portfolio
- Summary: Discover how PCI’s GenTrader platform helped a client optimize their energy dispatch and asset portfolio, resulting in significant cost savings and operational efficiency
- Key benefits:
- Achieved substantial cost savings of over $500 million
- Improved accuracy and consistency of portfolio modeling
- Enhanced decision-making with detailed study results
- What our client said: “Since 2005, our collaboration and partnership with PCI, including using their very comprehensive GenTrader platform, has been instrumental in optimizing our entire resource portfolio to help us save more than $500 million — and counting.” – Executive director
Case Study: Half a Billion Dollars Saved: Enhancing Operational Efficiency and Renewable Integration
- Client Problem: Expanding renewable energy capacity while maintaining reliable and cost-effective operations.
- Summary: Discover how PCI’s comprehensive platform helped a client save over $500 million through optimized power generation, advanced forecasting, and efficient resource management.
- Key benefits:
- Annual savings of $54-70 million, equating to a $2-4 per megawatt-hour discount to ratepayers
- Enhanced reliability through joint Balancing Authority operations and advanced reserve management
- Strategic flexibility to adapt to future challenges, including integrating battery storage
- What our client said: “Implementing PCI’s platform has transformed our operations, delivering up to $70 million in savings each year and significantly enhancing our ability to manage renewable integration and operational complexities.” – Executive director
Integrated suite of tools
"Having one vendor where all of those different tools and solutions work with each other, it just made sense for us instead of having a vendor to do this and a vendor to do that."
- Jason Smith, Senior Engineer, Santee Cooper
More time for analysis
"We're able to do our jobs faster and easier, and it just gives us time to focus on analyzing the data, instead of preparing data."
- Brad Lafler, Market Optimization Lead, Lincoln Electric System
Unified platform and team
"I think the fact that multiple departments can use the same tool, it kind of helps bring all of us together speaking the same language."
- John Mayhew, Senior Real Time Trader, PNM
Trust through transparency
"I see our PCI relationship more like a peer or a teammate than just a provider or supplier."
- Juan Guichard, CEO, Ammper Energia
Rapid ROI realized
"PCI's integrated solutions have delivered significant cost savings and efficiency gains for Santee Cooper. Their tools and support have been invaluable to our business."
- Chris Moore, Business Analyst, Santee Cooper
Tailored software solutions
"If PCI isn't able to find a solution directly in their products, we work with them in several different capacities to come up with customizable solutions in their product. And those have worked very well, even through upgrades in their system."
- Tucker Smith, Sr. Market Coordinator, Basin Electric