What Happens When a Transmission Developer Modifies Its Facility Design in NYISO?

May 1, 2025
/
ISO/RTO Documentation Chatbot

Disclaimer: This blog post, which answers “What does it mean when a transmission developer modifies its facility design in NYISO after submission to a planning process?,” was generated using PCI’s ISO/RTO Documentation AI Chatbot, powered by ChatGPT. While the content is based on curated market documentation, it is intended for informational purposes only and may not reflect the most up-to-date or comprehensive information. We recommend verifying any key details directly with relevant sources before making business decisions.

For the latest answer to this question, generated live, visit our free ISO/RTO Documentation Chatbot.

 

 

When a transmission developer modifies its facility design after submitting it to NYISO’s planning process, it can trigger a series of evaluations and potential consequences. These changes, especially during public policy transmission planning or competitive processes, are closely scrutinized to ensure they don’t disrupt the integrity of the planning cycle. But what exactly does NYISO consider a material modification, and how does it handle these changes?

In this blog post, we’ll explore how NYISO treats post-submission design changes, what qualifies as a material modification, and the potential consequences for project evaluation and eligibility. You’ll learn how these rules maintain fairness and reliability in NYISO’s planning processes and what developers need to know to avoid setbacks.

ISO/RTO Documentation Chatbot

Use our AI to search Business Practice Manuals from ISO/RTO markets at no cost.

Try the Chatbot

Why facility design changes matter in NYISO’s planning process

Imagine a transmission developer submits a project proposal to NYISO’s public policy transmission planning process. The project is designed to address a specific reliability need or public policy requirement. But midway through the evaluation, the developer decides to modify the facility’s design—perhaps to incorporate new technology or adjust for unforeseen challenges. While these changes might seem minor, they can have significant implications for the planning process.

NYISO’s planning processes are built on transparency, fairness, and reliability. When a developer modifies its facility design after submission, it can disrupt the evaluation process, create inconsistencies, or even give the project an unfair advantage over others. That’s why NYISO has strict rules for handling post-submission changes, especially when they qualify as material modifications.

How NYISO treats post-submission design changes

NYISO evaluates post-submission design changes on a case-by-case basis to determine their impact on the planning process. If the changes are minor and don’t affect the project’s ability to meet the identified need, they may be accepted without significant consequences. However, if the changes are deemed material, they can trigger a more rigorous review.

Material modifications are changes that significantly alter the scope, cost, or performance of a project. For example, replacing a key component with a different technology, changing the project’s location, or altering its capacity could all qualify as material modifications. NYISO considers these changes carefully because they can affect the project’s eligibility, evaluation, and even its ability to compete fairly with other proposals.

When a material modification is identified, NYISO may require the developer to resubmit the project or provide additional documentation. In some cases, the project may be disqualified from the current planning cycle if the changes are too disruptive or if they compromise the integrity of the process.

What qualifies as a material modification?

Not all design changes are created equal. NYISO uses specific criteria to determine whether a change qualifies as a material modification. While the exact thresholds can vary, here are some common examples:

  • Significant changes to project scope: Altering the size, location, or purpose of the project in a way that affects its ability to meet the identified need.
  • Technology substitutions: Replacing a key component with a different technology that changes the project’s performance or cost.
  • Cost increases: Substantial changes to the project’s estimated cost, especially if they affect its competitiveness.
  • Timeline adjustments: Delays or changes to the project’s schedule that could impact its ability to meet reliability needs within the required timeframe.


These changes are evaluated not only for their technical impact but also for their potential to disrupt the fairness and transparency of the planning process.

The consequences of material modifications

When a material modification is identified, the consequences can vary depending on the nature and timing of the change. In some cases, NYISO may allow the project to proceed with additional documentation or adjustments. However, more significant changes can lead to disqualification from the current planning cycle.

For example, if a project’s design change affects its ability to meet the identified need or creates an unfair advantage, NYISO may remove it from consideration. This ensures that all projects are evaluated on a level playing field and that the planning process remains transparent and reliable.

Developers should also be aware that material modifications can delay the evaluation process, as NYISO may need additional time to assess the changes. This can create challenges for developers who are working within tight timelines or competing for limited opportunities.

How developers can avoid setbacks

To minimize the risk of setbacks, developers should carefully review their project designs before submission and avoid making changes unless absolutely necessary. If changes are unavoidable, it’s important to communicate with NYISO as early as possible and provide detailed documentation to support the modifications.

Developers should also familiarize themselves with NYISO’s rules and guidelines for post-submission changes. By understanding what qualifies as a material modification and how NYISO handles these changes, developers can make informed decisions and avoid potential pitfalls.

Staying ahead in NYISO’s planning process

Post-submission design changes can be a challenging aspect of NYISO’s planning process, but they’re also an opportunity for developers to demonstrate their commitment to transparency and reliability. By understanding how NYISO treats these changes, what qualifies as a material modification, and the potential consequences, developers can navigate the process with confidence.

Ultimately, NYISO’s rules for post-submission changes are designed to maintain fairness and integrity in the planning process. By following these guidelines and communicating openly with NYISO, developers can ensure their projects are evaluated fairly and contribute to the reliability of the grid.

For the latest answer to this question, generated live, visit our free ISO/RTO Documentation Chatbot.
Picture of ISO AI

ISO AI

The ISO/RTO Documentation AI Chatbot (ISO AI) is a specialized AI tool designed to provide accurate and detailed information about the operations, procedures and regulations of U.S.-based Independent System Operators (ISOs) and Regional Transmission Organizations (RTOs) based on their business practice manuals (BPMs). It will enable you to quickly build expertise in markets including CAISO, ERCOT, ISO-NE, MISO, NYISO, PJM, and SPP (including WEIS), and familiarize yourself with new markets like SPP Markets+ and EDAM, while offering quick access to the resources the chatbot’s answers are based on so that you can verify the information independently or explore topics in greater depth.

Related blog posts

Loading...
May 13
ISO/RTO Documentation Chatbot

How the IESO Resettlement Process Works Under MRP

ontario, canada
May 13
ISO/RTO Documentation Chatbot

How Make-Whole Payments Work Under IESO’s Market Renewal Program

new york streetlights to illustrate new york capacity market
May 13
ISO/RTO Documentation Chatbot

How NYISO Handles Reserve MW Calculations in Real-Time Market Operations

Related press

Loading...
open laptop
Feb 18
About Us,Cybersecurity

PCI Successfully Completes SOC/FISMA Examinations for 2024

Hector Hernandezcortes of PCI Energy Solutions receiving Iberdrola Mexico's prestigious award for Best Supplier in Innovation, Digitalization, and New Technologies at the company’s annual "Allies for the Green Industry" event in 2024
Nov 27
About Us,Customer Success,Mexico,Renewable Energy Trading

PCI Energy Solutions Named Best Supplier in Innovation, Digitalization, & New Technologies by Iberdrola Mexico

Oct 29
Hydrogen

Intermountain Power Agency Expands Hydrogen Storage Tracking Capabilities Using PCI Energy Solutions’ Platform

PCI Energy Solutions

PCI Energy Solutions

Also known as Power Costs, Inc.

Connect with us

U.S. 1+ 405.447.6933

Sales 1+ 405.701.7301

301 David L. Boren Blvd., Suite 2000
Norman, OK 73072

Contact us

We’re Hiring! 

Linkedin Twitter
  • Energy Trading and Optimization
  • ETRM
  • Wholesale Market Participation
  • Portfolio Optimization
  • Settlements and Billing
  • Gas & Fuels Management
  • Generation Outage Management
  • Company Type
  • Utilities
  • Generators
  • Traders
  • Renewable Energy
  • Asset Managers
  • Retailers
  • About
  • About Us
  • Leadership
  • Newsroom
  • Our Technology
  • PCI Insights
  • Cybersecurity
  • AWS Partnership
  • Careers

Subscribe to our newsletter

Subscribe
  • Transmission and Reliability
  • Transmission Outage Management
  • Transmission Scheduling
  • e-Tagging
  • Balancing Authority Operations
  • Energy Accounting
  • Settlements and Billing
  • Sustainable Energy
  • Renewables Trading & Scheduling
  • Energy Storage Optimization & Trading
  • Hydrogen
  • Hydropower
  • Carbon Intensity
  • Markets
  • North America
  • Latinoamerica
  • Europe
  • Australia
  • Thought Leadership
  • Blog
  • Webinars & Events
  • Newsletter
  • Case Studies
  • Customer Portal
  • INFOCUS Conference
  • Product Trainings
  • Product Documentation
  • Issue Tracker

© Power Costs, Inc. 2025 | All Rights Reserved.

  • Privacy Policy
  • Sitemap
Manage Cookie Consent
To provide the best experiences, we use technologies like cookies to store and/or access device information. Consenting to these technologies will allow us to process data such as browsing behavior or unique IDs on this site. Not consenting or withdrawing consent, may adversely affect certain features and functions.
Functional Always active
The technical storage or access is strictly necessary for the legitimate purpose of enabling the use of a specific service explicitly requested by the subscriber or user, or for the sole purpose of carrying out the transmission of a communication over an electronic communications network.
Preferences
The technical storage or access is necessary for the legitimate purpose of storing preferences that are not requested by the subscriber or user.
Statistics
The technical storage or access that is used exclusively for statistical purposes. The technical storage or access that is used exclusively for anonymous statistical purposes. Without a subpoena, voluntary compliance on the part of your Internet Service Provider, or additional records from a third party, information stored or retrieved for this purpose alone cannot usually be used to identify you.
Marketing
The technical storage or access is required to create user profiles to send advertising, or to track the user on a website or across several websites for similar marketing purposes.
Manage options Manage services Manage {vendor_count} vendors Read more about these purposes
View preferences
{title} {title} {title}

[gravityform id=”3″ title=”false” description=”false” ajax=”true”]

Request More Information

[gravityform id=”4″ title=”false” description=”false” ajax=”true”]

[gravityform id="11" title="false" description="false" ajax="true"]
Solutions

Energy Trading and Optimization

  • ETRM
  • Wholesale Market Participation
  • Portfolio Optimization
  • Settlements and Billing
  • Gas & Fuels Management
  • Generation Outage Management
  • ETRM
  • Wholesale Market Participation
  • Portfolio Optimization
  • Settlements and Billing
  • Gas & Fuels Management
  • Generation Outage Management

Transmission and Reliability

  • Transmission Outage Management
  • Transmission Scheduling
  • e-Tagging
  • Balancing Authority Operations
  • Settlements and Billing
  • Energy Accounting
  • Transmission Outage Management
  • Transmission Scheduling
  • e-Tagging
  • Balancing Authority Operations
  • Settlements and Billing
  • Energy Accounting

Sustainable Energy

  • Renewable Energy Trading & Scheduling
  • Energy Storage Optimization & Trading
  • Hydrogen
  • Hydropower
  • Carbon Intensity
  • Renewable Energy Trading & Scheduling
  • Energy Storage Optimization & Trading
  • Hydrogen
  • Hydropower
  • Carbon Intensity

Markets

  • North America
  • Latinoamerica
  • Europe
  • Australia
  • North America
  • Latinoamerica
  • Europe
  • Australia

Resources

Thought Leadership

  • Blog
  • Newsletter
  • Webinars & Events
  • Case Studies
  • ISO/RTO Documentation AI Chatbot
  • Blog
  • Newsletter
  • Webinars & Events
  • Case Studies
  • ISO/RTO Documentation AI Chatbot

Customer Portal

  • INFOCUS Conference 2025
  • Product Trainings
  • Product Documentation
  • Issue Tracker
  • INFOCUS Conference 2025
  • Product Trainings
  • Product Documentation
  • Issue Tracker

About Us

  • About
  • Leadership
  • Newsroom
  • Our Technology
  • PCI Insights
  • Cybersecurity
  • AWS Partnership
  • About
  • Leadership
  • Newsroom
  • Our Technology
  • PCI Insights
  • Cybersecurity
  • AWS Partnership

Careers

Contact Us