Skip to content
Contact
Set Up A Call
  • Blog
  • RTC+B Market Trials: How PCI Is Supporting ERCOT Clients Through a Critical Transition
Share this post
Picture of Chris Espinosa

Chris Espinosa

transmission lines

RTC+B Market Trials: How PCI Is Supporting ERCOT Clients Through a Critical Transition

May 7, 2025
/
ETRM,Settlements and Billing,US ISO/RTO Markets

ERCOT’s Real-Time Co-Optimization with Battery Storage (RTC+B) initiative marks one of the most transformative changes to ERCOT’s market design in years. And now, the next milestone is underway: Summer Market Trials. 

Earlier this year, PCI partnered with EPAM to host a public webinar introducing the scope and impacts of RTCB (Request materials for “RTC+B Unpacked” webinar here). That session helped market participants understand what was coming and how RTC+B would affect bidding, settlements, and battery storage workflows. 

This blog post builds on that foundation by sharing where things stand today and how PCI is actively supporting our clients through market trials with software updates, expert guidance, and smart tools. 

At PCI, we’re proud to be supporting our ERCOT clients through this critical phase, not just with robust software updates, but with hands-on guidance, documentation tools, and continued collaboration that aligns with ERCOT’s evolving market rules. 

What’s changing under RTC+B? 

RTC+B enables ERCOT to simultaneously optimize energy dispatch and ancillary services in real time, while introducing a unified model for energy storage resources (ESRs). This is designed to improve grid efficiency, resource participation, and price transparency. 

Participants will see impacts across: 

  • Bid formulation and AS offers 
  • COP changes and telemetry alignment 
  • Day-ahead and real-time market coordination 
  • ESR Battery Storage Operations 


In short, this redesign touches every phase of the bid-to-bill process.
 

Where we are now: RTC+B Market Trials 

As of this month, ERCOT’s Summer Market Trials are live. These trials give participants the opportunity to validate system readiness ahead of RTC+B’s formal implementation. 

At PCI, we’ve been preparing for this moment for months, working closely with our clients to ensure systems are configured, workflows are understood, and teams are confident in the changes ahead. 

We’ve already hosted direct meetings, provided client-specific documentation, and shared guidance on how our software is evolving to support RTC+B. 

We also leveraged AWS Cloud to build and deploy on-demand RTCB hosted environments, empowering our clients to seamlessly connect with ERCOT’s new RTC+B system. 

How PCI software is changing to support RTC+B 

We’ve introduced software changes across our platform to support the new RTC+B framework. These include: 

  • New COP Status Codes 
  • DAM AS-Only Offers 
  • RTM AS Offers 
  • ESR Single Model Transition and Offers 
  • ESR Single Model Outage Management 
  • New RTCB Reports, Prices, and Notifications 


Whether it’s updating calculation workflows or enabling Real-time AS offers, these changes are designed to keep clients fully compliant and operationally ready.
 

RTC+B timeline at a glance 

Here are a few key dates market participants should keep in mind: 

  • May 5, 2025 – Start of RTCB Market Trials Phase 1 
  • July 7, 2025 – RTCB Market Trials Phase 2 
  • September 2, 2025 – RTCB Market Trials Phase 3 
  • October 31, 2025 – Tentative, End of RTCB Market Trials 

Meet your new RTC+B companion 

To help clients and market participants stay on top of the evolving RTC+B requirements, we’ve launched the RTC+B Chatbot, an AI-powered documentation assistant trained on ERCOT protocols, NPRRs, and market design materials. 

Ask questions like: 

  • “What are the new RTC+B bidding requirements?” 
  • “How does RTC+B change ancillary service offers in ERCOT?” 
  • “What are the impacts on ESR modeling and settlement?” 

RTC+B Bot

Query manuals from ERCOT’s Real-Time Co-Optimization with Batteries (RTC+B) program

Try the Chatbot

What’s next? 

We’ll continue guiding our clients through the remainder of Market Trials and into go-live, where we will support an overnight cutover. 

And while we work effortlessly with our clients, stay tuned — a follow-up webinar is planned for early October to recap learnings from Market Trials and look ahead to go-live. 

Until then, keep watching this space. We’ll continue posting updates and resources as the market evolves. 

Want to see how PCI supports every stage of bid-to-bill? Explore our Energy Trading and Optimization solutions to learn how we help market participants stay ahead of complex market changes like RTC+B.

Picture of Chris Espinosa

Chris Espinosa

Chris Espinosa is a senior product manager at PCI with over 10 years experience in ERCOT operations. He received his bachelor’s degree in economics from the University of Texas. Chris now leads the development of PCI GenManager.

Related blog posts

Loading...
aerial or large city
May 12
ETRM

Energy Trading & Risk Management Basics: What You Need to Know

Apr 30
Energy Trading and Optimization,ETRM,US ISO/RTO Markets

Bidding Strategies for Maximizing Battery Value

bridge and transmission lines
Apr 01
Transmission Scheduling,US ISO/RTO Markets,Wholesale Market Participation

Understanding Financial & Physical Transmission Rights in the Western Electricity Markets

Related press

Loading...
open laptop
Feb 18
About Us,Cybersecurity

PCI Successfully Completes SOC/FISMA Examinations for 2024

Hector Hernandezcortes of PCI Energy Solutions receiving Iberdrola Mexico's prestigious award for Best Supplier in Innovation, Digitalization, and New Technologies at the company’s annual "Allies for the Green Industry" event in 2024
Nov 27
About Us,Customer Success,Mexico,Renewable Energy Trading

PCI Energy Solutions Named Best Supplier in Innovation, Digitalization, & New Technologies by Iberdrola Mexico

Oct 29
Hydrogen

Intermountain Power Agency Expands Hydrogen Storage Tracking Capabilities Using PCI Energy Solutions’ Platform

PCI Energy Solutions

PCI Energy Solutions

Also known as Power Costs, Inc.

Connect with us

U.S. 1+ 405.447.6933

Sales 1+ 405.701.7301

301 David L. Boren Blvd., Suite 2000
Norman, OK 73072

Contact us

We’re Hiring! 

Linkedin Twitter
  • Energy Trading and Optimization
  • ETRM
  • Wholesale Market Participation
  • Portfolio Optimization
  • Settlements and Billing
  • Gas & Fuels Management
  • Generation Outage Management
  • Company Type
  • Utilities
  • Generators
  • Traders
  • Renewable Energy
  • Asset Managers
  • Retailers
  • About
  • About Us
  • Leadership
  • Newsroom
  • Our Technology
  • PCI Insights
  • Cybersecurity
  • AWS Partnership
  • Careers

Subscribe to our newsletter

Subscribe
  • Transmission and Reliability
  • Transmission Outage Management
  • Transmission Scheduling
  • e-Tagging
  • Balancing Authority Operations
  • Energy Accounting
  • Settlements and Billing
  • Sustainable Energy
  • Renewables Trading & Scheduling
  • Energy Storage Optimization & Trading
  • Hydrogen
  • Hydropower
  • Carbon Intensity
  • Markets
  • North America
  • Latinoamerica
  • Europe
  • Australia
  • Thought Leadership
  • Blog
  • Webinars & Events
  • Newsletter
  • Case Studies
  • Customer Portal
  • INFOCUS Conference
  • Product Trainings
  • Product Documentation
  • Issue Tracker

© Power Costs, Inc. 2025 | All Rights Reserved.

  • Privacy Policy
  • Sitemap
Manage Cookie Consent
To provide the best experiences, we use technologies like cookies to store and/or access device information. Consenting to these technologies will allow us to process data such as browsing behavior or unique IDs on this site. Not consenting or withdrawing consent, may adversely affect certain features and functions.
Functional Always active
The technical storage or access is strictly necessary for the legitimate purpose of enabling the use of a specific service explicitly requested by the subscriber or user, or for the sole purpose of carrying out the transmission of a communication over an electronic communications network.
Preferences
The technical storage or access is necessary for the legitimate purpose of storing preferences that are not requested by the subscriber or user.
Statistics
The technical storage or access that is used exclusively for statistical purposes. The technical storage or access that is used exclusively for anonymous statistical purposes. Without a subpoena, voluntary compliance on the part of your Internet Service Provider, or additional records from a third party, information stored or retrieved for this purpose alone cannot usually be used to identify you.
Marketing
The technical storage or access is required to create user profiles to send advertising, or to track the user on a website or across several websites for similar marketing purposes.
Manage options Manage services Manage {vendor_count} vendors Read more about these purposes
View preferences
{title} {title} {title}

[gravityform id=”3″ title=”false” description=”false” ajax=”true”]

Request More Information

[gravityform id=”4″ title=”false” description=”false” ajax=”true”]

[gravityform id="11" title="false" description="false" ajax="true"]
Solutions

Energy Trading and Optimization

  • ETRM
  • Wholesale Market Participation
  • Portfolio Optimization
  • Settlements and Billing
  • Gas & Fuels Management
  • Generation Outage Management
  • ETRM
  • Wholesale Market Participation
  • Portfolio Optimization
  • Settlements and Billing
  • Gas & Fuels Management
  • Generation Outage Management

Transmission and Reliability

  • Transmission Outage Management
  • Transmission Scheduling
  • e-Tagging
  • Balancing Authority Operations
  • Settlements and Billing
  • Energy Accounting
  • Transmission Outage Management
  • Transmission Scheduling
  • e-Tagging
  • Balancing Authority Operations
  • Settlements and Billing
  • Energy Accounting

Sustainable Energy

  • Renewable Energy Trading & Scheduling
  • Energy Storage Optimization & Trading
  • Hydrogen
  • Hydropower
  • Carbon Intensity
  • Renewable Energy Trading & Scheduling
  • Energy Storage Optimization & Trading
  • Hydrogen
  • Hydropower
  • Carbon Intensity

Markets

  • North America
  • Latinoamerica
  • Europe
  • Australia
  • North America
  • Latinoamerica
  • Europe
  • Australia

Resources

Thought Leadership

  • Blog
  • Newsletter
  • Webinars & Events
  • Case Studies
  • ISO/RTO Documentation AI Chatbot
  • Blog
  • Newsletter
  • Webinars & Events
  • Case Studies
  • ISO/RTO Documentation AI Chatbot

Customer Portal

  • INFOCUS Conference 2025
  • Product Trainings
  • Product Documentation
  • Issue Tracker
  • INFOCUS Conference 2025
  • Product Trainings
  • Product Documentation
  • Issue Tracker

About Us

  • About
  • Leadership
  • Newsroom
  • Our Technology
  • PCI Insights
  • Cybersecurity
  • AWS Partnership
  • About
  • Leadership
  • Newsroom
  • Our Technology
  • PCI Insights
  • Cybersecurity
  • AWS Partnership

Careers

Contact Us