Skip to content
Contact
Set Up A Call
  • Blog
  • How ERCOT Procures Emergency Response Service (ERS)
Share this post
Picture of ISO Bot

ISO Bot

Belton, Texas

How ERCOT Procures Emergency Response Service (ERS)

February 22, 2025
/
ISO Bot

Disclaimer: This blog post, which answers “How does ERCOT procure Emergency Response Service (ERS)?” was generated using PCI’s ISO/RTO Documentation AI Chatbot, powered by ChatGPT. While the content is based on curated market documentation, it is intended for informational purposes only and may not reflect the most up-to-date or comprehensive information. We recommend verifying any key details directly with relevant sources before making business decisions.

For the latest answer to this question, generated live, visit our free ISO/RTO Documentation Chatbot.

 

 

When the Texas grid faces emergencies, ERCOT’s Emergency Response Service (ERS) plays a critical role in maintaining reliability. ERS is a demand-side resource program designed to reduce load or inject energy into the grid during times of stress. But how does ERCOT procure ERS, and what does the process look like? Let’s dive into the details of this essential program.

In this blog post, we’ll walk you through ERCOT’s ERS procurement process, including eligibility requirements, how auctions work, the structure of contract terms, and how ERS resources are activated during grid emergencies. We’ll also explore recent trends and changes in ERCOT’s ERS program to give you a complete picture of its evolving role in grid reliability.

ISO/RTO Documentation Chatbot

Use our AI to search Business Practice Manuals from ISO/RTO markets at no cost.

Try the Chatbot

How ERCOT procures ERS

ERCOT procures Emergency Response Service through a competitive process designed to ensure reliability while managing costs. The process begins with ERCOT issuing Requests for Proposals (RFPs) for each ERS Standard Contract Term, which are divided into four periods throughout the year: December through March, April and May, June through September, and October and November. These RFPs invite Qualified Scheduling Entities (QSEs) to submit offers on behalf of ERS resources.

ERCOT procures four types of ERS services: Weather-Sensitive ERS-10, Non-Weather-Sensitive ERS-10, Weather-Sensitive ERS-30, and Non-Weather-Sensitive ERS-30. The numbers “10” and “30” refer to the maximum response time in minutes for each service type. This flexibility allows ERCOT to tailor its emergency response to the specific needs of the grid.

Eligibility requirements for ERS participation

To participate in ERS, resources must meet specific eligibility criteria. Only QSEs capable of receiving Extensible Markup Language (XML) messaging and Verbal Dispatch Instructions (VDIs) can submit offers. Additionally, ERS resources must meet technical requirements, such as being able to reduce load or inject energy into the grid within the specified response time.

ERCOT also distinguishes between ERS Generators and ERS Loads. ERS Generators are non-intermittent resources that inject energy into the grid, while ERS Loads are demand-side resources that reduce consumption. Both types of resources can participate individually or as part of an aggregation.

How ERCOT’s ERS auctions work

The ERS procurement process uses a clearing price auction mechanism. QSEs submit offers specifying the capacity they can provide and the price at which they’re willing to do so. ERCOT evaluates these offers based on cost-effectiveness and other factors, such as geographic location and its impact on grid congestion.

If the total cost of an offer exceeds the expenditure limits set by ERCOT’s Emergency Response Service Procurement Methodology, the capacity may be prorated. However, this only happens if the QSE has indicated a willingness to accept prorated capacity and specified a minimum acceptable limit.

ERS contract terms and obligations

Once selected, ERS resources are bound by contract terms that align with the ERS Standard Contract Term. These contracts specify the capacity obligations and the time periods during which resources must be available. ERCOT posts details about the procured capacity, the types of resources selected, and the projected costs on its website before the start of each contract period.

If ERCOT deploys ERS during a grid emergency, resources are required to respond for the duration of the event. Failure to meet deployment obligations can result in penalties, including payment reductions or suspension from future participation.

How ERS resources are activated during emergencies

When grid conditions deteriorate, ERCOT activates ERS resources to stabilize the system. Activation typically occurs during energy emergencies, such as when operating reserves fall below critical levels. ERS resources are dispatched based on their response time and the type of service they provide.

For example, Weather-Sensitive ERS-10 resources might be deployed during extreme weather events when demand spikes, while Non-Weather-Sensitive ERS-30 resources could be used to address longer-term imbalances. This tiered approach ensures that ERCOT can respond effectively to a wide range of grid conditions.

Recent trends and changes in ERCOT’s ERS program

In recent years, ERCOT has made several updates to its ERS program to enhance grid reliability. One notable trend is the increasing participation of aggregated resources, which allows smaller loads and generators to contribute to ERS. This shift reflects a broader industry trend toward distributed energy resources and demand-side management.

ERCOT has also focused on improving transparency and stakeholder engagement. For instance, the Emergency Response Service Procurement Methodology, which outlines the rules and procedures for ERS procurement, is now available as an Other Binding Document on ERCOT’s website. This ensures that market participants have a clear understanding of the program’s requirements and processes.

Why ERCOT’s ERS program matters

ERCOT’s Emergency Response Service is a cornerstone of grid reliability in Texas. By leveraging demand-side resources and non-intermittent generators, ERCOT can respond quickly to emergencies and prevent widespread outages. The program’s competitive procurement process ensures that these services are cost-effective, while its evolving structure reflects the changing dynamics of the energy market.

As the grid continues to face challenges from extreme weather and growing demand, ERS will remain a vital tool in ERCOT’s reliability toolkit. Whether you’re a market participant or simply interested in how the Texas grid operates, understanding ERS is key to appreciating the complexities of modern energy systems.

For the latest answer to this question, generated live, visit our free ISO/RTO Documentation Chatbot.

Picture of ISO Bot

ISO Bot

The ISO/RTO Documentation AI Chatbot (ISO Bot) is a specialized AI tool designed to provide accurate and detailed information about the operations, procedures and regulations of U.S.-based Independent System Operators (ISOs) and Regional Transmission Organizations (RTOs) based on up-to-date versions of their documentation. It will enable you to quickly build expertise in all North American organized power markets, while offering quick access to the resources the chatbot’s answers are based on so that you can verify the information independently or explore topics in greater depth.

Related blog posts

Loading...
wind turbine
Sep 22
ISO Bot

ATC, Counterflow, and Why Did ATC Go Negative?

transmission lines
Sep 19
ISO Bot

DA Hourly vs RT 5-Minute: How Prices Aggregate & Settle by ISO

Sep 17
ISO Bot

Shadow Prices & Shift Factors 101 (with N-0 vs N-1)

Related press

Loading...
Dec 09
About Us,Our Technology

PCI Energy Solutions Named a 2025 Geo & Global AWS Partner Award Finalist

Dec 09
About Us,Cybersecurity

PCI Achieves SOC 2 Type II Attestation, Reinforcing Security for 2026 & Beyond

Nov 25
Line Rating Management,Transmission Outage Management

Versant Power Achieves FERC 881 Compliance with PCI’s Line Ratings Management System

PCI Energy Solutions

PCI Energy Solutions

Also known as Power Costs, Inc.

Connect with us

U.S. 1+ 405.447.6933

Sales 1+ 405.701.7301

301 David L. Boren Blvd., Suite 2000
Norman, OK 73072

Contact us

We’re Hiring! 

Linkedin Twitter
  • Energy Trading and Optimization
  • ETRM
  • Wholesale Market Participation
  • Portfolio Optimization
  • Settlements and Billing
  • Gas & Fuels Management
  • Generation Outage Management
  • Company Type
  • Utilities
  • Generators
  • Traders
  • Renewable Energy
  • Asset Managers
  • Retailers
  • Platform
  • PCI AI
  • PCI Insights
  • Our Technology
  • Cybersecurity
  • AWS Partnership
  • Careers

Subscribe to our newsletter

Subscribe
  • Transmission and Reliability
  • Transmission Outage Management
  • Transmission Scheduling
  • e-Tagging
  • Balancing Authority Operations
  • Energy Accounting
  • Sustainable Energy
  • Renewables Trading & Scheduling
  • Energy Storage Optimization & Trading
  • Hydrogen
  • Hydropower
  • Carbon Intensity
  • Forecasting
  • Markets
  • North America
  • Latinoamerica
  • Europe
  • Australia
  • Energy Market Chatbots
  • ISO/RTO Markets
  • CENACE (Mexico)
  • SPP Markets+ (New Market)
  • ERCOT RTC+B (Update)
  • About
  • About Us
  • Leadership
  • Newsroom
  • Thought Leadership
  • Blog
  • Webinars & Events
  • Newsletter
  • Case Studies
  • Customer Portal
  • INFOCUS Conference
  • Product Trainings
  • Product Documentation
  • Issue Tracker

© Power Costs, Inc. 2025 | All Rights Reserved.

  • Privacy Policy
  • Sitemap
Manage Cookie Consent
To provide the best experiences, we use technologies like cookies to store and/or access device information. Consenting to these technologies will allow us to process data such as browsing behavior or unique IDs on this site. Not consenting or withdrawing consent, may adversely affect certain features and functions.
Functional Always active
The technical storage or access is strictly necessary for the legitimate purpose of enabling the use of a specific service explicitly requested by the subscriber or user, or for the sole purpose of carrying out the transmission of a communication over an electronic communications network.
Preferences
The technical storage or access is necessary for the legitimate purpose of storing preferences that are not requested by the subscriber or user.
Statistics
The technical storage or access that is used exclusively for statistical purposes. The technical storage or access that is used exclusively for anonymous statistical purposes. Without a subpoena, voluntary compliance on the part of your Internet Service Provider, or additional records from a third party, information stored or retrieved for this purpose alone cannot usually be used to identify you.
Marketing
The technical storage or access is required to create user profiles to send advertising, or to track the user on a website or across several websites for similar marketing purposes.
  • Manage options
  • Manage services
  • Manage {vendor_count} vendors
  • Read more about these purposes
View preferences
  • {title}
  • {title}
  • {title}

Request More Information

  • This field is for validation purposes and should be left unchanged.

Name
I am not a robot 🤖

Solutions

Energy Trading and Optimization

  • ETRM
  • Wholesale Market Participation
  • Gas & Fuels Management
  • Portfolio Optimization
  • Settlements and Billing
  • Generation Outage Management
  • ETRM
  • Wholesale Market Participation
  • Gas & Fuels Management
  • Portfolio Optimization
  • Settlements and Billing
  • Generation Outage Management

Transmission and Reliability

  • Transmission Outage Management
  • Transmission Scheduling
  • e-Tagging
  • Balancing Authority Operations
  • Energy Accounting
  • Transmission Outage Management
  • Transmission Scheduling
  • e-Tagging
  • Balancing Authority Operations
  • Energy Accounting

Sustainable Energy

  • Renewable Energy Trading & Scheduling
  • Energy Storage Optimization & Trading
  • Hydrogen
  • Hydropower
  • Carbon Intensity
  • Forecasting
  • Renewable Energy Trading & Scheduling
  • Energy Storage Optimization & Trading
  • Hydrogen
  • Hydropower
  • Carbon Intensity
  • Forecasting

Platform

  • PCI AI
  • PCI Insights
  • Our Technology
  • Cybersecurity
  • AWS Partnership
  • PCI AI
  • PCI Insights
  • Our Technology
  • Cybersecurity
  • AWS Partnership

Markets

  • North America
  • Latinoamerica
  • Europe
  • Australia
  • North America
  • Latinoamerica
  • Europe
  • Australia

Energy Market AI Chatbots

  • ISO Bot (North American Markets)
  • M+ Bot (New Market)
  • RTCB Bot (Market Update)
  • CEN Bot (Mexico)
  • ISO Bot (North American Markets)
  • M+ Bot (New Market)
  • RTCB Bot (Market Update)
  • CEN Bot (Mexico)

Resources

Thought Leadership

  • Blog
  • Newsletter
  • Webinars & Events
  • Case Studies
  • Blog
  • Newsletter
  • Webinars & Events
  • Case Studies

Customer Portal

  • INFOCUS User Conference
  • Product Trainings
  • Product Documentation
  • Issue Tracker
  • INFOCUS User Conference
  • Product Trainings
  • Product Documentation
  • Issue Tracker

About Us

  • About
  • Leadership
  • Newsroom
  • Contact Us
  • About
  • Leadership
  • Newsroom
  • Contact Us

Careers